Road Building

Back to Homepage

 

Stage two:

Road building - Stage 2

Material is removed to a depth of 18 inches.
Approx. 60 tons of damaged tarmac and earth was removed from this stretch of road...


<<BACK  NEXT >>
 

Portfolio | References | Contact

  ESC Tarmac Surfacing - Driveways, Roads & Ground-work. Tarmacadam UK ©2003
  
Tarmacing: Berkshire, Hampshire, The Thames Valley & South East England