Tarmac Road Construction

Back to Homepage

 

Stage three:



Firstly dry scalpings are laid and rolled into a firm base.
Followed by a layer of 20mm grade tarmac and a layer of 10mm grade tarmac.
Finally the top layer of 6mm grade tarmacadam is laid to give a smooth durable surface...

<<<BACK NEXT>>
 

Portfolio | References | Contact

  ESC Tarmac Surfacing - Driveways, Roads & Ground-work. Tarmacadam UK ©2003
  
Tarmacing: Berkshire, Hampshire, The Thames Valley & South East England